Sooner or later every Anaplan builder inherits a model: the original architect left, a partner engagement ended, or two business units merged their workspaces. Nobody can say why a module exists, and changing anything feels risky. This tutorial gives a repeatable audit you can finish in a few days, and a documentation pack that stops the problem recurring.
Step 1: Freeze the baseline
Before touching anything, protect yourself.
- Confirm you hold the right workspace and model roles, and note who owns the model on the business side.
- Save a revision tag or, if your setup uses ALM, record the current revision so you can compare later.
- Export the model's current state of key outputs (headline P&L, headcount, demand totals) as a reference set. Any later refactor should reproduce these numbers.
Step 2: Map the structure
Open the model's general lists, modules and actions views and build a simple inventory in a spreadsheet or on a Anaplan documentation module:
- Lists: name, type (flat, hierarchy, numbered), item count, and which modules use it.
- Modules: purpose, dimensions, whether it is an input, calculation, mapping, or output module, and its approximate size.
- Imports, exports, processes: source, target, schedule, and who runs them.
- Dashboards: audience and the modules behind each.
Group modules into layers (data hub or staging, inputs, calculations, reporting). If the model does not follow a clear layering, note where flow crosses layers backwards. Those crossings are where most surprises hide.
Step 3: Trace the dependency flow
Pick the three outputs the business cares about most. For each, work backwards using the line item's formula and the Trace Precedents and Trace Dependents tools, listing every module on the path. The result is a short data lineage diagram. Anything on no path from an input to an output is a candidate for removal.
Step 4: Find dead weight and hotspots
With the inventory in hand, look for:
- Unused line items and modules: no dependents, no dashboard use, not an output. Mark rather than delete at this stage.
- Oversized modules: many dimensions or very large lists combined with line items that are mostly empty or default. Review the model's size by module and focus on the biggest few.
- Heavy formulas: nested IF chains, lookups through long text keys, and SUM or SELECT across large dimensions in modules that recalculate on every input change.
- Duplicated logic: the same calculation rebuilt in several modules rather than calculated once and referenced.
- Hard-coded values: constants inside formulas that should be inputs in a settings module.
- Inconsistent naming and missing notes: prefixes that change by author, line items called Calc 1.
Record each finding with severity (breaks accuracy, hurts performance, only confusing) and effort.
Step 5: Review access and security
Check roles and actions against what the business expects: who can edit inputs, who can run imports, and who can see sensitive data such as salary. Look at selective access, dynamic cell access, and whether users hold access that is broader than their job. Flag mismatches for the model owner to decide; do not change access during the audit.
Step 6: Review integrations and schedules
List every integration touching the model: CloudWorks connections, Anaplan Connect scripts, REST API jobs, or third-party connectors. For each, confirm credentials ownership, schedule, failure alerting, and what happens when the source file changes shape. An integration that depends on a former employee's personal login is a risk to log immediately.
Step 7: Test before you refactor
Agree acceptance checks with the business: reconciliation totals, a few known-answer scenarios, and the reference exports from Step 1. Add simple check line items that flag when totals do not tie. Only then begin cleanup, in a development copy, in small batches, rerunning the checks after each one.
Step 8: Leave a handover pack
The audit is only useful if the next person benefits. Produce:
- The inventory and lineage diagram, stored where the team will find it.
- A one-page model overview: purpose, owners, refresh calendar, and known limitations.
- The prioritized findings backlog.
- Naming and layering conventions to apply to future changes.
- Line item notes on the key calculations, written for someone who has never met the original builder.
Schedule a light review each quarter so documentation tracks the model.
When to bring in help
If the audit shows structural problems, such as a flat design that cannot scale, heavy performance issues, or integrations nobody owns, a targeted remediation is usually cheaper than continuing to patch. QuanticPlanning's Anaplan architects run model audits and rescue engagements; get in touch with a description of your model and we will scope it with you.